When I converted my pdf to xlsx format, some dates in a table were not converted correctly. In the pdf file, the dates were in mm/dd/yyyy format, but if the day was between 1-12, Export PDF treated the date as if was in dd/mm/yyyy format. It couldn't do that for dates with day 13-31 because that would have been an invalid month so these dates were converted correctly. This problem does not occur when converting the pdf file to Word docx format.
Is this a known problem?